Product Overview
According to the layout provided by the customer's equipment supplier, our designers designed and quoted the steel structure part.
Component |
Description |
Steel Columns |
Vertical load-bearing members that support the weight of the structure and transfer loads to the foundation. |
Steel Beams |
Horizontal load-bearing members that distribute the weight from the roof and upper floors to the columns. |
Roofing and Wall Panels |
Steel sheets used to cover and enclose the workshop, providing weather protection and insulation. |
Insulation |
Material used between panels to regulate temperature, control sound, and enhance energy efficiency. |
Windows |
Fixed or operable openings in walls, providing natural light, ventilation, and visibility. |
Foundation |
The base that supports the entire structure, usually made of concrete, which the columns are anchored to for stability. |
Ventilation Systems |
Mechanisms for air exchange and proper airflow, essential for maintaining a comfortable and safe working environment. |
Product Advantages
Steel construction offers numerous advantages that make it a popular choice for various building projects. Some of the key advantages include:
Title |
Steel Structure Workshop |
Description |
A steel structure workshop is a facility designed and constructed primarily using steel components, providing a versatile and durable space for various industrial and commercial activities. |
Purpose |
To provide a safe and efficient working environment for manufacturing, assembly, storage, and other industrial processes. |
Advantages |
High strength and durability, capable of withstanding heavy loads and adverse weather conditions. |
Prefab steel Structure workshop buildings are used for industrial production in which all steel structures are painted and then delivered to the project site for installation.
And because the steel structure can be manufactured in the factory and installed on-site, the construction time is significantly reduced. Due to the steel it can dramatically reduce construction waste and is more environmentally friendly. Therefore, it widely used in industrial buildings and civil buildings.
Project Parameters
Project Name |
Easy assembly construction prefabricated warehouse building light portal frame workshop steel structure in Reunion |
Main steel structure |
1.Steel Q355B(S355JR) or Q235B(S235JR)H shape |
(columns and beams) |
2. Straight cross-section or Variable cross-section |
Sub steel structure |
1.Material Q235B(S235JR) steel |
2.Bolt connections. Anti-rust painted or galvanized |
3. Bracing:X-type or V-type or other type bracing made from angle, round pipe, etc |
4. Purlin:C or Z type |
Roof |
Sandwich panel(PU/EPS/fiberglass/rook wool) or Colorful steel tile |
Wall |
Sandwich panel(PU/EPS/fiberglass/rook wool) or Colorful steel tile |
Doors |
Roller shutter door, Sandwich panel sliding door |
Windows |
Alu. Alloy window, Plastic steel window |
Edge Cover |
Steel sheet 0.4-0.6mm thickness |
Bolts |
M24,M22,M16 embedded bolts,intensive bolts,galvanized ordinary bolts,high-strength bolts, etc |
Others options |
Skylight panel,Roof ventilator,Down pipe,Galvanized,Crane,sanitary Products |
Foundation |
Cement and steel foundation bolts |
Project Exhibition
Packaging& Trasportation
1. All standard components are packed in plywood box.
2. All steel structure weld components are packed with blanket or bubble-wrap to avoid scratch during loading and unloading.
3. All steel structure are packed in steel pallet together into container, much save loading and unloading time, labor cost.
4. All sandwich panel are packed in steel pallet.
5. Material components will be made container load plan, also make regional unloading plan to avoid retransport on site.
Company Profile
Our company: QINGDAO GUSITE CONSTRUCTION ENGINEERING CO.,LTD
-------is a high-tech, diversified and export-oriented large-scale international private enterprise integrating R&D, design, production, installation and construction at home and abroad, and technical services.
Since its establishment,Gusite has been constantly seeking sustainable development and has created value for society and customers with the service tenet of "Quality first. Customer first". Facing the current good situation of the booming international economy, with brand-new concepts, scientific management and high-quality services, the company strictly follows the development idea of 'market-oriented, large-scale and scientific", doing a good job in the present, focusing on the future, and striving to move forward to the ranks of the first-class construction enterprises in the country.
Production Capacity
Our factory has multiple production lines, equipped with steel cutting, shot blasting, stamping, bending, welding, forming equipment. The technology and equipment are advanced, and the steel structure is of good quality and durable.
The company can produce more than 30 kinds of series products with different structures and specifications. It has complete processing and manufacturing equipment and strong installation capabilities. It can supply a full set of materials required for steel structure construction products, and provide all installation services and technical consultation.
NO. |
Production Line |
Annual production |
1 |
2 composite board production lines |
more than 1 million meters/year |
2 |
5 color steel plate production lines |
2 million meters/year |
3 |
2 H-type steel CNC production lines |
20000 tons/year |
4 |
1 C-type steel production line |
2500 tons/year |
5 |
1 Z-steel production line |
2,000 tons/year |
Possess the foreign contracted project management qualification certificate issued by the Ministry of Commerce of China, CE certification [EN1090 certificate], IS09001 certificate, etc.
Design and Management Ability
We engineers they are familiar with the all kinds of steel structure design and all the detailed drawings. Our engineer team is a very experienced and efficient team. They understand customer's requirements and giving the accurately design to save the client's time.
We also can provide professional installation team and we also can send our engineer in installation guidance service.
Customer feedback
FAQ
Q1:Are you manufacturer or trade company?
We are professional manufacturer of steel structure building.
Q: Do you accept container loading inspections?
A: You are welcome to send an inspector, not only for the container loading but any time during the production time.
Q: Do you offer designing service for us?
A: Yes, we could design full solution drawings to your requirements. They use software such as Auto CAD, PKPM, MTS, 3D3S, etc.
Q: What is the delivery time?
A: Delivery time depends on order quantities. In general, the delivery time to the nearest seaport in China will be 30 days after receiving the deposit.
Q: How long can the space frame be used?
A: The useful life of the main structure is the designed used life, which is 50-100 years (standard request of GB).
Q: Can you send engineers or the whole team to install my project?
A: We will give detailed installation drawings and videos for free. We could dispatch installation engineers as installation directors or a team upon request.
QUOTATION!
If you have drawings, welcome to share drawings with us, quoation will be done based your drawings. Our excellent design team will design the steel structure workshop warehouse for you. If you give the following information, we will give you an satisfactory drawing.
1 Location (where will be built? ) which country? which city?
2 Size: Length*width* Eave height _____mm*_____mm*_____mm
3 wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s
4 snow load (max. Snow height) _____kn/m2, _____mm, temperature range?
5 anti-earthquake _____level
6 brickwall needed or not If yes, 1.2m high or 1.5m high? or other?
7 thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former.
8. door quantity & size _____units, _____(width)mm*_____(height)mm
9 window quanity & size _____units, _____(width)mm*_____(height)mm
10 crane needed or not If yes, _____units, max. Lifting weight____tons; Max. Lifting height _____m